
Project Reference · Industrial Protection
International Steels Limited
Corrosion protection of powerplant exhaust stacks and chimneys through an AQUAZINGA coating system in Karachi, Pakistan.
Customer / Structure
International Steels Limited · Powerplant Exhaust Stacks & Chimneys
Client
International Steels Limited
Application Date
April 2024
Surface Preparation
Garnet Blasting to Sa 3 · ISO 8501-1
Location / Environment
Karachi, Pakistan · C5
Project Comparison
Before & After Application
Drag the divider to compare the initial structure with the completed Zinga coating installation.
Before
After
‹›
DRAG LEFT OR RIGHT TO COMPARE
Project Gallery
Additional project photographs and inspection stages.


Installation Phase
Project execution
Inspection · August 2024
Inspection after 3 months
Project Site
Project documentation
Project Work
On-site execution
Completed Installation
April 2025
Initial Condition
Before Zinga applicationProject Overview
Zinga Mosh Pakistan executed a corrosion protection project for International Steels Limited, covering powerplant exhaust stacks and chimneys in Karachi. The project involved garnet blasting to Sa 3 in accordance with ISO 8501-1, followed by application of the AQUAZINGA coating system. The specified dry film thickness (DFT) was 80–100 µm. Project photographs document the initial condition, surface preparation, installation and inspection stages.
