Karachi Shipyard & Engineering Works Ltd.Caisson Gate #1 Rehabilitation
Corrosion protection for Caisson Gate #1 at Karachi Shipyard & Engineering Works Ltd. The specified system combines ZINGA and ZINGATARFREE for a dry dock gate application in an immersed and marine environment.
Explore the Caisson Gate Project
Drag the divider to compare two views from the supplied project photographs.
Project View 01
Project View 02
DRAG LEFT OR RIGHT TO COMPARE PROJECT PHOTOS
Project Gallery
Original project photographs supplied with the existing page.


On-site Project View
Project photograph 02
Project Documentation
Project photograph 03
Caisson Gate Site View
Project photograph 04Project Overview
Karachi Shipyard & Engineering Works Ltd. undertook rehabilitation work for Caisson Gate #1 at its dry dock facility in Karachi, Pakistan. The project specification identifies an Im2/C5 environment and a duplex coating system using ZINGA beneath ZINGATARFREE. Surface preparation included grit blasting to Sa 2½ under ISO 8501-1, followed by ultra-high-pressure water jetting at 700–1000 bar to remove soluble salts. The specified coating system comprises one ZINGA coat at 60 µm DFT and two ZINGATARFREE coats at 180 µm DFT each.