Exploring the relationship between welding activities and zinc-rich corrosion protection through the KGTL Karachi Gateway Terminal project.

Customer / Project Karachi Gateway Terminal (KGTL)
Case Study Focus ZINGA on Welding / Welding on ZINGA
Location Karachi, Pakistan
The Project Approach

Welding and ZINGA Corrosion Protection

Understanding the relationship between welding operations, surface preparation and zinc-rich coating application.

Welding and corrosion protection require careful consideration when working with steel structures. The KGTL case study focuses on the relationship between welding on ZINGA-coated steel and applying ZINGA around welded areas. The supplied photographs document the project through surface preparation, work in progress and the completed coating appearance. The objective is to present the practical project sequence while keeping the distinction between welding activities and subsequent corrosion-protection work clear.

Existing ZINGA Coating

Consider the condition of the zinc-rich coating before welding activities. The coating condition and approved welding procedure determine the appropriate preparation requirements.

Welding Activities

Welding on coated steel requires an appropriate project-specific procedure, including consideration of coating removal around the weld area and workplace safety.

Surface Preparation

Prepare the relevant steel and welded areas according to the approved coating specification before applying the corrosion-protection system.

ZINGA Application

Apply the specified zinc-rich coating system to suitably prepared areas, following the product requirements and project application procedure.

Duplex / Local PU Finish

The supplied completed-project photograph identifies a ZINGA, duplex and local PU finish. The final appearance is documented in the after photograph.

Project Documentation

Review the before, preparation, during-work and completed-project photographs to understand the visual progression of the KGTL work.

Why welding and ZINGA sequencing matters: Welding and zinc-rich coating application need to follow a compatible project specification. Welding activities, surface preparation, coating reinstatement and inspection should be coordinated so the completed steelwork receives the intended corrosion-protection system.
Project Results

Before and After ZINGA Application

View the supplied KGTL project photographs before and after the coating work.

KGTL project steelwork before ZINGA application
Before Application
KGTL project after ZINGA duplex and local PU finish
After ZINGA · Duplex / Local PU
Surface Preparation

Preparing Steel for Corrosion Protection

Surface preparation photographs from the KGTL project.

KGTL steel surface preparation photograph
Surface Preparation
Additional KGTL surface preparation photograph
Preparation Work
Project Photographs

KGTL Project Gallery

Explore additional photographs documenting the project work.

The gallery presents the additional supplied KGTL project photographs. Image captions are kept general where the exact activity has not been independently identified.

Project Considerations

Welding, Coating and Inspection

Key considerations when coordinating welding work with a zinc-rich corrosion-protection system.

A successful coating system requires attention to the steel substrate, the welding procedure and the condition of the finished surface. For the KGTL project, the supplied photographs provide a visual record of the before condition, preparation work, project activities and completed coating appearance.

Welding Procedure

Follow the approved welding procedure and applicable safety requirements when working with previously coated steel.

Surface Preparation

Ensure the relevant steel surfaces meet the preparation requirements of the approved coating specification.

Coating Reinstatement

Restore the specified corrosion-protection system around prepared and welded areas using compatible coating materials.

Final Inspection

Verify the completed coating system against the project requirements, including relevant application and inspection records.